Teamwork Training Program Introduction & Explanation Of Expenses 2 day day two

Teamwork Training Program 2-day time flow chart

TimeActivityActivity Goal
08:30GatheringGathering at the LC Outdoor Training Center, registration, covid protection.
08:30 – 09:00Warming UpCreate team atmosphere
09:05 – 12:00 Laser RoomMaking and Sticking to the plan
12:00 – 13:00 Lunch Break + RestLunch Box + water
13:00 – 13:30Warming UpActive team atmosphere
13:35 – 15:00Team PyramidResponsibility, Focus on own duty
15:05 – 17:00Graduation WallResponsibility, Sacrifice, Giving, Team Spirit
17:00 – 18:00Sharing Time & Group PhotoSharing Time & Group Photo Summarize and the whole team photo
18:00ReturnReturn to a warm home

Detailed introduction to Productivity Training -2-day Project

08:30    

 The X- Group has to come to the LC Outdoor Training Base. Trainers checking register, covid protection, hanging out the water bottle, a guide to place the storage box for belonging.

08:30 – 09:00    

 [Warming Up] Create a team atmosphere

Activity Introduction

Warming up and creating comfort between participants in indoor or outdoor training and team meetings.

Objectives

  1. Activate the team atmosphere and spirits.
09:05 – 12:00   

  [Laser Room] Making and Sticking to the plan

Activity Introduction

According to the rules, do not touch the Laser strings and are not allowed to speak. Transport all the team members to the other side of the Laser strings through different sizes of network ports. One member per one port is allowed to pass through the Laser strings.

Objectives

  1. Understanding the resources and using them effectively.
  2. Obeying the organization’s rules and regulations.
  3. Making and Sticking to the plan. Be aware not to destroy others’ plans.
  4. Building the team spirits and strong team.
12:00 – 13:00    

 [Lunch Break + Rest] (Lunch Box + Water)

13:00 – 13:30    

[Warming Up] Active team atmosphere.

13:35 – 15:00    

 [Team Pyramid] Responsibility, Focus on own duty

Activity Introduction

All the participants have to build a pyramid by using the given materials (eg. Pipes, Joints). After building a pyramid, members need to place (14) balls on the top of the pyramid within a specific time.

Objectives

  1. Make absolutely serious.
  2. Focus on your own duty, without blaming the other teammate.
15:05 – 17:00

[Graduation Wall] Responsibility, Sacrifice, Giving, Team Spirit

Activity Introduction

This activity is also known as the Victory Wall. Members have to climb over the 4.2-meter wall at a specific time and are not allowed to make a sound during the mission.

Objectives

  1. Examining overall teamwork and team spirits. Improving execution, leadership, and decision-making.
  2. Facing the challenges bravely.

 

17:00 – 18:00    

 [Sharing Time & Group Photo] Company leader summary, evaluation, give the award and take some memorable photos

18:00 (Return)

[Return to a warm home]

Training Fees

ItemsService contentsPrice
Training CostsTraining Course Design、Training Service Cost(Professional Trainers)
Allocation:1 Trainer,1 Assistant Trainer,1 Admin
$70/Pax
General ExpensesInclude:Training Clothes(Group allocation clothes )、Training facilities、water bottle、flag、training base、Vinyl、Video record、medicine etc.$2/Pax
Total$72/Pax
Food (Optional)Normal Lunch Box (Myanmar Taste)$3/Pax (Lunch)
Transportation
(Optional)
#colspan#
Third Party Bus Transportation Fee: 50 seat/1.4 lakhs/bus, 30 seat/1 lakh/bus

Training Course Statement

This scheme version is authorized by LC Myanmar. Without our permission, it cannot be used for third-party cooperation or research. Otherwise, it will be deemed as an infringement. Our company will reserve the right to investigate those who do not comply with this statement or use the contents of this scheme without authorization!